Construction Site Security
Off-grid solar-powered barriers, access control and security for construction sites. Remove manned security costs, prevent HSE intervention and keep your site compliant - deployed in minutes.
-
Site Security
Protect assets and prevent unauthorised access
-
Quick Deploy
Set up in minutes without mains power
-
24/7 Monitoring
Remote surveillance and alerts
-
Scalable
Solutions for sites of all size
Construction: site security, there's always the sun...
Running a construction site means constant pressure, on security, compliance, traffic management and carbon commitments, all at once. That now includes EV. charging for site vehicles and plat, so decarbonising your fleet doesn't mean bringing in another supplier. SG work with construction teams to take that pressure off, providing everything from off-grid temporary solar barriers and CCTV to traffic signals, air quality monitoring and fixed access control, all under one supplier with one point of contact.
Whether your site needs a solution deployed tomorrow or a fully integrated setup built around a long-term programme, SG have the products, the expertise and the support to deliver it.
-
Solar/Hydrogen Vaults
The ECO-GEN is a durable, off-grid power and communications system designed for challenging environments where traditional infrastructure is limited.
Learn More -
Fire Safety Systems
P&D Specialist Services deliver fire alarm system installation and upgrade projects in complex, live environments.
Learn More -
-
Pallet Trailers
Transport solution with built-in lifting mechanism. No forklift, no crane? No problem.
Learn More -
-
Hilber Solar Micro Grid
Fully self-contained solar hybrid power systems, no grid connections needed.
Learn More -
-
-
Berlex Traffic Signals
Portable temporary traffic signals for construction traffic management.
Learn More -
-
-
EV Charging Stations
Off-grid EV charging for site vehicles and plant, designed, installed and managed for you.
Learn More -
Fixed Access Control
Bespoke fixed-install solutions for gates, barriers, bollards and access control, designed and delivered by SG.
Learn More -
"First class service!"
Kenny Lawrie
"All good, it's magic. Pleased to be able to programme numbers on to the intercom for ease."
Chris Tate — Persimmon Homes
"Installing the SG barriers has significantly improved safety and efficiency on-site, enhancing operatives' and public welfare while enabling versatile deployment in any scenario."
Dewet Du Plessis — G2S, HS2, EKFB
Case Studies

Neighbours on One Side, a Construction Site on the Other
Persimmon Homes, one of the UK’s largest housebuilders, delivering thousands of new homes every year across sites that vary enormously in scale and location. The challenge on their site near Brighton wasn’t unusual for the industry, but it was one that needed solving properly. On one side of...
Click here to read more
GS6 INSTABOOM™ protects M20 work lane from overhead strikes. Zero Carbon:Zero Harm
Balfour Beatty Vinci JV calculate savings of £2.4m by utilising INSTABOOM™ barriers and dramatically cut incursion and improve worker safety on the M4 SMART motorway J3-12 project.
Click here to read more
Solar Gates Protects and Secures SCS HS2 Site
Solar Gates UK is delighted to have been chosen by SCS to secure and protect their HS2 construction worksites. With over 20 SOSEC barriers across the site, up to 4 SOSEC barriers protect each entrance, creating a secure two-way traffic airlock. The huge scale of the HS2 project means that security...
Click here to read more
Kier Living develops unique, green site security solution with SOSEC
Kier Living was seeking a solution to their ‘no one shut’s the gate’ problem. Using SOSEC barriers on Kier sites has allowed them to cut site security costs, improve public demarcation, reduce HSE interventions.
Click here to read more
Kier saves £30,000 per site with SOSEC solar barriers
The SOSEC solar barrier has allowed us to make considerable saving on our site security costs, we certainly would not want to go back to the old, labour intensive, methods of securing the site
Click here to read more
When 1,000 Deliveries a Day Can't Afford to Stop, SOSEC 200 Keeps HS2 Moving
There are big construction projects, and then there is HS2. The numbers alone are hard to grasp: 30 million cubic metres of earth moved, 81 bridges, 15 viaducts and a workforce of over 4,000 people, all working to deliver Britain’s new high-speed rail backbone. When SG were chosen to provide...
Click here to read more